-
RESIDENTIAL
Mehta's residence 2023
Jaipur 8,500 sq. ft.
Budget: 8 crores Timeline: 18 months
A home designed around light, flow, and everyday functionality—balancing privacy with openness.
+
HOSPITALITY
The Grand Resort 2022
Goa 15,000 sq. ft.
Budget: 25 crores Timeline: 24 months
An immersive resort experience blending luxury with local heritage, featuring panoramic views.
+
URBAN DESIGN
City Square Plaza 2021
Mumbai 50,000 sq. ft.
Budget: 120 crores Timeline: 36 months
Revitalizing the urban core with pedestrian-friendly pathways, green spaces, and sustainable infrastructure.
+
INSTITUTIONAL BUILDINGS
Tech University Campus 2024
Pune 120,000 sq. ft.
Budget: 80 crores Timeline: 48 months
A modern educational facility designed to foster collaboration and innovation through open-plan architecture.
+
INDUSTRIAL BUILDINGS
Eco-Factory Unit 2020
Gujarat 200,000 sq. ft.
Budget: 45 crores Timeline: 12 months
A sustainable manufacturing hub incorporating solar roofing and natural ventilation systems.
+
LANDSCAPE DESIGN
Botanical Gardens 2023
Bangalore 5 Acres
Budget: 15 crores Timeline: 14 months
Creating a biodiverse oasis in the city center, featuring native flora and serene water features.